Hadlow, Kentinfo@thompsonstowers.com

Mon–Sat 9am–5pm · Sunday closedOut of hours emergencies answered
- 

Services

Areas

Our WorkReviewsAboutContactCall us direct07355 037000Get a Free Quote

Call

Home/ServicesCladding Scaffolding

# Cladding ScaffoldingIn Hadlow,Boarded For Facade Work
Fully boarded access scaffolding for cladding and facade work: timber cladding, panel systems, weatherboarding, insulation and rainscreen build-ups.

Get My Free Quote  07355 037000

Free survey, written quote within one day, six weeks' hire included.

CISRS-carded teams

Every scaffolder trained and card-checked

£10m insurance

Public and employers' liability cover

6 weeks' hire

Included as standard on every scaffold

Family-run

Katie &amp; Mason Thompson, office in Hadlow

The Thompsons Towers standard

## Cladding Scaffolding Backed By A Team You Can Check

### CISRS-carded scaffolders
Every scaffolder trained, carded and checked before they set foot on your property.

### £10m public and employers' liability
Full cover in place on every domestic and commercial job we take on.

### Free survey, quote in one day
We survey at no charge and send an itemised written quote back within one day.

### Six-week hire included
Six weeks of hire as standard, with weekly inspections throughout.

Get a Free Quote 

The service

## Access built around the cladding build-up
Cladding is fixed to the whole face of a building, not to one small area, so the scaffold has to serve every square metre of the elevation from a comfortable working position. That means continuous boarded lifts, sensible lift heights and a gap between the boards and the wall that suits the build-up going on.

That gap matters more on cladding than on almost any other job. Battens, insulation, breather membranes and finished boards all add thickness, and a scaffold set too tight leaves your fixers working with no room, while one set too far out leaves an unsafe reach and a gap that needs guarding.

We plan lift heights around the cladding coursing wherever possible so fixers are working at chest height rather than reaching over their heads or bending to the deck. It's a small planning decision at survey that makes a real difference to speed and finish quality.

Ties are planned with your cladding contractor so they land where they can be sealed and made good, and are removed and patched in the right sequence as the elevation is completed rather than left as an afterthought.

Everything is erected by CISRS-carded scaffolders in TG20 compliant configurations, fully boarded and guarded, tagged and inspected weekly. Design drawings and calculations are available at extra charge for non-standard structures.

### Who it's for
Cladding contractors, builders, timber-frame and barn conversion specialists, main contractors and homeowners recladding a property.

### When you need it
Timber cladding and weatherboarding, rainscreen and panel systems, external wall insulation, facade repairs and full recladding programmes.

### Why it's specific
The board-to-wall gap, lift heights and tie positions all have to suit the cladding build-up; a general-purpose scaffold rarely gets all three right.

What it costs to wait

## What goes wrong when a cladding scaffold is planned as a general scaffold
Most cladding delays we're called into fixing are access problems, not fixing problems. The scaffold was built before anyone asked what was going on the wall.

### Wrong distance from the wall
Too tight and there's no room for battens, insulation and boards; too far and fixers overreach across an unguarded gap.

### Lift heights fighting the coursing
Lifts that land mid-panel force awkward working positions, slow the fix down and show in the finished lines.

### Ties in the wrong places
Ties landing in visible or unsealable positions leave patching problems in a finished facade, or force late, risky alterations.

### Mistakes we get called out to fix
Not telling the scaffolder the cladding build-up thickness before erection
- Leaving the top lift below the finished eaves, so the last course is out of reach
- Ordering a scaffold with boarding to one lift only when every lift needs boarding
- Ignoring where materials will be lifted and stored during the fix
- Removing ties early without agreeing a sequence, weakening the structure
- Forgetting pavement, driveway or neighbour access during a long-run cladding programme

Our process

## From First Call ToSigned-Off Scaffold

01
### Free survey
We measure the elevations, check ground conditions and ask what cladding system is going on so the build-up thickness is known upfront.

02
### Quote in one day
A written quote within one day covering lifts, boarding, ties, hire period and any protection or licences needed.

03
### Set out and erect
Base and standards set out at the planned distance from the wall, with lifts built to suit the cladding coursing and every lift boarded.

04
### Handover
Guardrails, toe boards, brick guards where needed, then a scaff tag and RAMS handed over so your fixers can start straight away.

05
### Inspect and adapt
Weekly inspections while it stands, ties removed and made good in agreed sequence, then a clean dismantle and clearance.

What you get

## Specific Outcomes,Not Vague Promises

### The right gap, first time
The board-to-wall distance is set from your actual build-up, so fixers have room to work and nothing needs altering mid-programme.

### Fully boarded lifts
Every lift is boarded rather than boarding to one lift only, so the whole elevation is workable from top to bottom.

### Lifts that match the coursing
Working heights are planned around the cladding lines, which speeds the fix and improves the finished result.

### Ties planned with your fixer
Tie positions are agreed so they can be sealed and made good, and removed in a sequence that keeps the scaffold safe.

### Tidy sites, happy neighbours
Materials stacked neatly, drives and paths kept usable, and Katie handles neighbour conversations before they become problems.

### Six weeks included
Cladding programmes run on; six weeks' hire is standard and extensions are agreed simply, with inspections continuing throughout.

In detail

## How we approach cladding scaffolding in detail
The detail on a cladding scaffold is mostly geometry and sequencing, both of which need deciding before the first standard goes in the ground.

### Materials used
Standard tube and fitting scaffold with fully boarded lifts is our default, because it lets us set the exact distance from the wall and adjust bay by bay around bays, gables and returns rather than accepting fixed frame dimensions.

Boards are laid tight with toe boards and double guardrails, and brick guards or netting added where material could fall from the deck. Where sheeting is needed to keep the facade dry during a fix, we allow for the additional wind load in the tie pattern.

### Methods and sequencing
We set out from the finished cladding face rather than the existing wall, so the working gap is right once the battens, insulation and boards are on. Lifts are then set to suit coursing, with the top lift high enough to fix the final course and any trim comfortably.

Ties are installed into sound substrate and their removal is sequenced with the cladding fix, so the scaffold never loses more lateral restraint than it can afford, and holes are made good as the elevation is closed up.

### Service variations
Full-elevation independent scaffolds suit whole-house or whole-block recladding. Bay or gable-only scaffolds suit repairs and partial replacement, and can often be moved round the building in phases to reduce hire.

Loading bays and material platforms can be built in where cladding boards and panels have to be lifted and stored at height, and temporary roof systems added where the works open up a roof at the same time.

### Situations it applies to
Timber-clad barn conversions and new houses, weatherboarded Kent cottages, rainscreen and panel systems on commercial units, external wall insulation on solid-wall properties, and facade repairs where panels or boards have failed.

Awkward settings are common: cladding scaffolds often need to bridge over conservatories, single-storey extensions, patios and planting, all of which we plan at survey rather than improvising on the day.

### Residential vs commercial differences
On homes the emphasis is protecting gardens, drives and paving, keeping doors and windows usable, and keeping neighbours informed; especially on semi-detached and terraced properties where a scaffold touches a boundary.

On commercial cladding programmes the emphasis is on programme dates, RAMS and site paperwork, public protection where the facade fronts a footpath, and coordination with other trades working the same elevation.

Common questions

## Cladding ScaffoldingQuestions Answered
Still unsure? Ring 07355 037000 and speak to Katie or Mason directly.

How far from the wall should a cladding scaffold sit?+Far enough to fit your battens, insulation and finished boards with room to fix comfortably, and no further. We set out from the finished cladding face, which is why we ask about the build-up at survey.

Will every lift be boarded?+Yes. Cladding needs continuous access up the elevation, so we quote fully boarded lifts rather than boarding to one lift only.

Can the scaffold be sheeted?+Yes, sheeting or netting can be added to keep the facade dry and contain debris. We allow for the extra wind load in the tie and bracing pattern when we do.

What happens to the tie holes?+Tie positions are agreed with your cladding contractor so they can be sealed, and ties are removed in sequence as the elevation is closed up.

How much does it cost?+It depends on the elevations, height, access and boarding required, so we survey free and quote in writing within one day. We'll beat any genuine written scaffolding quote.

How long is the hire?+Six weeks as standard with weekly inspections, and straightforward extensions if the cladding programme runs longer.

Is the scaffold guaranteed and insured?+Every scaffold is CISRS-erected, TG20 compliant, tagged and inspected, and we carry £10m public and £10m employers' liability insurance.

Do you cover my area?+Yes; office in Hadlow, yard in Five Oak Green, covering Tonbridge, Tunbridge Wells, Maidstone, Sevenoaks, Ashford, Canterbury, Dartford, Gravesend, Sussex and London.

## Related scaffolding services

- Rendering Scaffolding
- Renovation &amp; Refurbishment
- Commercial ScaffoldingSee every service on the scaffolding services overview or read more about Thompsons Towers.

## Areas we cover

- Tonbridge
- Tunbridge Wells
- Hadlow
- Kings Hill
- Paddock Wood
- Maidstone
- Sevenoaks
- Ashford
- Canterbury
- Dartford
- Gravesend
- London
- Sussex
- EssexPostcode not listed? Check our coverage or ring the office.

Free survey · Quote in one day

## Recladding a building?Let's get the access right.
Tell us the cladding system and elevations and we'll survey free, quote in one day and build access your fixers can actually work from.

 07355 037000Email the office

-  CISRS-carded scaffolders
-  £10m public &amp; employers' liability
-  RAMS, scaff tags &amp; inspections
-  Six-week hire included as standard
### Opening hours

- Monday9am – 5pm
- Tuesday9am – 5pm
- Wednesday9am – 5pm
- Thursday9am – 5pm
- Friday9am – 5pm
- Saturday9am – 5pm
- SundayClosedPhone answered out of hours for emergencies.

Family-run scaffolding from Hadlow, near Tonbridge. CISRS-carded scaffolders working across Kent, Sussex and London.

- 

### Services
Domestic Scaffolding
- Commercial Scaffolding
- Roofing Scaffolding
- Chimney Scaffolding
- Scaffolding For Extensions
- New-Build Scaffolding
- Renovation &amp; Refurbishment
- Temporary Roof Systems
- Access Scaffolding &amp; Towers
- Emergency Scaffolding
- Scaffold Hire
- Repointing &amp; Brickwork
- Internal Scaffolding
- Cladding Scaffolding
- Rendering Scaffolding
- Painting &amp; Decorating Scaffolding
- All scaffolding services

### Areas Covered

- Tonbridge
- Tunbridge Wells
- Hadlow
- Kings Hill
- Paddock Wood
- Maidstone
- Sevenoaks
- Ashford
- Canterbury
- Dartford
- Gravesend
- London
- Sussex
- Essex
- All areas covered

### Contact
Hadlow, Kent

Office in Hadlow. Our yard is based in Five Oak Green.

07355 037000

info@thompsonstowers.com

Mon–Sat 9am–5pm · Sunday closed

- About Us
- Our Work
- Reviews
- Contact

© 2026 Thompsons Towers Scaffolding Services Ltd. All rights reserved.

Privacy PolicyTerms &amp; ConditionsOwners: Katie &amp; Mason Thompson